Download a free scope of work template in Word: the work included by area, the materials and finishes, what is not included, permits, schedule, how changes are handled and signatures. A clear scope heads off arguments about what the price includes.
Free, no sign up. Two pages with examples. Works in Word and Google Docs.
What a scope of work includes
The customer and the job, a short project summary, the work included by area or phase, the materials and finishes the price is based on, the work not included, site access, permits and inspections, the schedule, how changes are handled and both signatures.
Write it so a homeowner can read it
Plain words, real sizes and quantities, and one line per piece of work. "Remove the vanity, tub, tile and drywall to the studs" leaves nothing to guess.
Name the products the price is based on
Brand, model, color and size for every product that matters, and who supplies it. When the homeowner later picks something else, the difference is clear.
Say what is not included
List the work a homeowner might assume is included but is not, such as moving a fixture or work in the next room. It is the cheapest way to avoid a dispute.
Scope, estimate and contract on one job in ContractorRise
In ContractorRise the estimate lines carry the scope, the contract the customer signs online is built from the same estimate, and the customer finds both in your portal under your name.
Describe the job and Estimate Builder drafts the material and labor lines with your markup. At a California remodeling company, a draft took a median of 3.5 minutes, with about 24 lines in a typical draft.
Questions and answers.
What is a scope of work in construction?
A written description of the work: what will be built, removed and installed, with which materials, and what is not included. It tells the customer and the crew exactly what the price covers.
What should a scope of work include?
The project summary, the work included by area or phase, the materials and finishes, the work not included, site access, permits and inspections, the schedule, how changes are handled and signatures.
Is a scope of work the same as a contract?
No. The scope describes the work; the contract adds the price, the payment schedule, the legal terms and the signatures. Many contractors attach the scope to the contract.
Who writes the scope of work?
The contractor writes it and reviews it with the customer before the contract is signed.
Is the template free?
Yes. Download it, add your company details and use it on your own jobs. No sign up is needed.
Can I edit it in Google Docs?
Yes. Upload the file to Google Drive and open it with Google Docs.